Attention: Safety Recall of Vernier Go Direct Charge Station. Click to learn more.

Shop

Experiments​

Engineering Project: Max Power

Experiment #9 from Wind Energy Explorations

Education Level
Middle School

Introduction

Wind turbines are constantly being redesigned to incorporate new technology and research. The intended use of the turbine also plays a large role in determining the final design, because using wind to pump water requires a different types of blade than using wind to produce electrical power.

In this project, you will construct two different wind turbines. One turbine will be designed to lift nine washers in the fastest time. The other turbine will be designed to produce the most electrical energy in 30 seconds.

Sensors and Equipment

This experiment features the following sensors and equipment. Additional equipment may be required.

Ready to Experiment?

Ask an Expert

Get answers to your questions about how to teach this experiment with our support team.

Purchase the Lab Book

This experiment is #9 of Wind Energy Explorations. The experiment in the book includes student instructions as well as instructor information for set up, helpful hints, and sample graphs and data.

Learn More

Wind Energy Explorations book cover
SAVE/SHARE YOUR CART